Kyalami Touring Rig

A 240-cabinet rig on a 22-date run, built and struck by the same eight-person crew every night.

A large touring LED wall part-way through build, the upper corner still open to the truss behind it, with crew working at the base.

The constraint

A 40-minute get-in window and a crew who would be doing it for the twenty-second time on four hours of sleep.

How it was resolved

Quarter-turn latches on every interface, no loose hardware anywhere in the system, and a cabinet mass of 7.2 kg so a single crew member can seat one one-handed while the other hand is on the truss. Build time settled at 38 minutes by date four.

Project record

These figures are presented with their operating or measurement condition. For a comparable brief, ask engineering for the relevant cabinet drawing, power and heat calculation, ingress certificate, calibration method and commissioning checks.

Cabinets
240

60 m² across two IMAG wings and a centre

Build time
38 min

eight crew, measured from date four

Cabinet mass
7.2 kg

one-handed seat

Failures
2 in 22 dates

both swapped inside a set change